JYTOP
Dual Channel 2 Waveforms Pelvic Muscle Trainer Healthcare
Dual Channel 2 Waveforms Pelvic Muscle Trainer Healthcare
Precio habitual
$118.00 USD
Precio habitual
Precio de oferta
$118.00 USD
Precio unitario
/
por
Los gastos de envío se calculan en la pantalla de pago.
No se pudo cargar la disponibilidad de retiro
Pelvic Muscle Trainer KM518
Pelvifine KM518 is designed for automatic Kegel exercises for incontinence and to enhance pelvic health.
Specifications
• Dual channel individually isolated circuits.
• Waveforms (Asymmetrical, rectangular bi-phasic for early trainer, Symmetrical, rectangular bi-phasic for Rehabilitation trainer).
• 11 Preset Modes +3 customized Modes.
• LCD display.
• Total trainer time display.
• Time duration of the treatment selectable.
• Low Battery Indicator.
Description
The pelvic organs, including the bladder, uterus, ovaries, fallopian tubes, vagina, prostate, and seminal vesicles, are allsupported and anchored in place by the pelvic floor muscles.
Pelvifine KM518 is designed for automatic Kegel exercises for incontinence and to enhance pelvic health.
--Loose pelvic muscles can result in urinary leaks and pelvic organ prolapse.
--Improving pelvic health can enhance bladder control.
--Weak pelvic muscles can cause uterine prolapse and gynecological issues.
Functions
--Prevent or reduce pelvic floor problems.
--Increase sexual satisfaction.
--Treat vaginal, uterine, and bowel prolapses (depending on severity of symptoms).
--Help strengthen muscles that have become weakened following childbirth, hernia operations or hysterectomies.
--Improve pelvic muscle strength and blood supply.
--Improve intimate sensation.
--Improve control and flatter tummy strong vaginal walls and great sex life for your both.
Pelvifine KM518 is designed for automatic Kegel exercises for incontinence and to enhance pelvic health.
Specifications
• Dual channel individually isolated circuits.
• Waveforms (Asymmetrical, rectangular bi-phasic for early trainer, Symmetrical, rectangular bi-phasic for Rehabilitation trainer).
• 11 Preset Modes +3 customized Modes.
• LCD display.
• Total trainer time display.
• Time duration of the treatment selectable.
• Low Battery Indicator.
Description
The pelvic organs, including the bladder, uterus, ovaries, fallopian tubes, vagina, prostate, and seminal vesicles, are allsupported and anchored in place by the pelvic floor muscles.
Pelvifine KM518 is designed for automatic Kegel exercises for incontinence and to enhance pelvic health.
--Loose pelvic muscles can result in urinary leaks and pelvic organ prolapse.
--Improving pelvic health can enhance bladder control.
--Weak pelvic muscles can cause uterine prolapse and gynecological issues.
Functions
--Prevent or reduce pelvic floor problems.
--Increase sexual satisfaction.
--Treat vaginal, uterine, and bowel prolapses (depending on severity of symptoms).
--Help strengthen muscles that have become weakened following childbirth, hernia operations or hysterectomies.
--Improve pelvic muscle strength and blood supply.
--Improve intimate sensation.
--Improve control and flatter tummy strong vaginal walls and great sex life for your both.
Specification
|
Vaginal Pain Relief
|
P01
|
|
Urge1/Prolapse
|
P02
|









Share
